We build the backhaul for telecom operators to maintain the required infrastructure for “Data on Demand” & emerging Data growth in India with the “Paradigm Shift” from 4G to 5G. In this journey we provide Services for:

- Site build up
- New Equipment installation.- TI-Installation of BTS,
- Site up-gradation.
- ISCFT/DT & Optimization - Drive Test – RF Optimization
- MW and transmission
- DPR (Daily Progress Report) sharing with Customers
- CAPEX Management/ Contractual Function & Resource Planning.
- Survey & feasibility check to confirm RFI
- Logistic Management
- Technical Support
- Operational Efficiency
- OPex Reduction
- Power Tapping
- Acceptance Test
- Trouble shooting & Testing of Links.

Pointed Support for Telco’s – E2E Network Optimization, Customized Solution, Wireless Quality Compliances.
- Small Cell installation
- Single Cell Functionality Test / DT / WTEMF Survey
- Network Audit
- Transmission Health Improvement
- Passive Utilities Installation, Operational Maintenance

- Underground (through HDD or manual trenching) cable laying
- Overhead (permanent aerial through installing poles) cable laying
- Patch replacement for network health enhancement.
- International Connectivity
- Building Ring Network for better redundancy
- Dressing & Reuse of OFC, Joint Closure by deploying best practices
- Identifying and Planning of OFC Route
- DPR (Daily Progress Report) sharing with Customers
- CAPEX Management/ Contractual Function & Resource Planning,
- RoW (Right of Work) permission enabler from Government/ Private Authorities.

ISP/Installation, Commissioning & Integration of Network Elements (NE) – Complete E2E solution on Node Integration with all Quality Compliances.
- Survey & feasibility check to confirm RFI
- Logistic Management
- Power Tapping
- I&C (Installation & Commissioning)
- Patch Chord Routing & Levelling
- NE addition/Migration
- Acceptance Test
- Trouble shooting & Testing of Links

Operations & Maintenance(O&M) of OFC/Transmission Network – Round the clock safe-guarding of Network which helps to keep up satisfaction level till the end users.
- Providing Network Maintenance Team (NMT) or Fault Repairing Team (FRT) with Vehicle
- Tools to maintain the Network
- Network Uptime: 99.99 %
- MTTR (Mean Time to Restore) / SLA (Service Level Agreement) as per Customer’s need
- Dressing & Reuse of OFC, Joint Closure by deploying best practices across the Network
- E2E Comprehensive Maintenance
- Hired NMT/FRT model
- Institutionalized Customer’s Internal Process in field

- WiFi installation
- FTTH (Fiber to the Home)
- Home Automation
- IoT Products Deployment
- Smart Parking
- E-Ticketing